UC San Diego Health Eating Disorder Clinic
This project included demolition of an existing space and then build-out of the new space. It included a full commercial kitchen that required our team to bring gas service into the building from the street. The overall build-out was very dense with a lot of smaller rooms, new private restrooms and a common corridor that wraps all the way around this half-floor space. All offices had a high STC rating.